Commissioning works

Production of commissioning works is a key area of activity for Complex Energy Solutions.
Since 2007, the company has commissioned more than 7 power units as the main installation organization and direct contractor. The current contract portfolio includes projects for the commissioning of combined-cycle and gas-turbine power units with a total capacity of more than 1.5 GW.
The accumulated experience and continuous development of competencies enable Complex Energy Solutions to offer its customers a full range of services for commissioning facilities, both in the form of turnkey proposals and individual stages of work.

Functions of the Parent setup organization:

— Distribution of the scope of installation work;
— Coordination of the actions of all participants in the installation process, and organizational support for the installation process;
— Engineering support and scheduling of the installation process;
— Monitoring the results of the installation process by all participants, and participation in the work of the acceptance commissions;
— Technical assistance during the start-up operations on the equipment;
— Participation in the organization and progress of construction, installation, and installation and commissioning works.
— Summarizing the results of commissioning and testing and issuing proposals for improving the technology, schemes, modes, and equipment designs;

Full range of commissioning works:

— Development of the PNR project;
— Analysis of design, factory, and relevant regulatory documentation, issuance of comments and suggestions on the project;
— Development of PNR work programs and schemes;
— Development of temporary operational documentation;
— Control of installation work, input control of equipment, and acceptance of equipment for adjustment;
— Organization and control of the work of the equipment suppliers' supervisory personnel;
— Commissioning (Individual tests and unit testing) of the main and auxiliary equipment of the power plant;
— Cold and hot commissioning of the equipment;
— Training of the operating personnel;
— Analysis of the commissioning work performed, preparation of executive documentation, presentations on the progress of work, and reporting materials;

Comprehensive testing and commissioning of the facility:

— Training of operating personnel;
— Management of comprehensive testing;
— Obtaining permits for putting the facility into operation;
— Certification tests, OPRH tests;
— Warranty tests;
— Technical support and assistance to the station's operational personnel during the pilot operation phase;

All commissioning and start-up work is carried out in accordance with the standards and requirements used both in the Russian Federation and in global practice (OPERCOM® Total methodology).