Performed works:
— Organisation of power unit equipment operation, technical support and technical assistance at the stage after comprehensive testing.
— Development of organisational structure for management of maintenance and repair of power unit equipment.
— Preparation of a list of operational, repair and regulatory and technical documentation.
— Development of production instructions and schemes, regulations for the power plant, workshops.
— Warranty operation of the equipment (HTs, KTTs, ETs, ACS) By own operating personnel.
— Long-term industrial operation of leased equipment of power plants (HTs, KTTs, ETs, APCS).
Equipment:
— Gas turbine units type SGT-600 mantfactured by Siemens.
— Water-heating heat recovery boilers of Taganrog Boiler Plant JSC.
— Peak hot-tube hot water boilers made by LOOS.
— Cummins emergency diesel-generator units.
— Four gas booster compressor units EGS-S-380/1600WA manufactured by Enerproject SA, Switzerland, the energy centre’s automated control system SIMATIC Process Control System 7 (PCS 7) manufactured by Siemens.
Integrated Energy Solutions LLC © 2026 All rights reserved.