Performed works:
— Coordination of installation.
— Organisation of commissioning works on the facility.
— Technical management of commissioning: Heat equipment, chemical water treatment, electrical equipment of 110 kV outdoor switchgear, power units and general station electrical equipment, field equipment of I&C of engineering systems.
Equipment:
— Seven SGT-800 Siemens gas turbine units with nominal capacity of 45 MW.
— Four hor-water boilers Vitomax-200 by Viessmann.