Performed works:
— Functioned as the head commissioning organisation.
— Commissioning of heat equipment, including commissioning of GTU and STU according to Siemens procedures.
— Commissioning of electrical equipment.
— Commissioning of general station equipment and systems.
— Commissioning of I&C and S&CV of the Power Unit.
— Chemical water treatment, water chemistry adjustment.
Equipment:
— Two gas turbines type SGT5-4000F, with generators type SGEN5-1000A.
— Steam turbine unit type SST5-5000 with condenser and generator type SGen5-1000A;
— Two heat-recovery boilers type En-274/320/44.6-12.69/ 3.08/0.46-566/561/237 with PEN VD HGC 5/11 and with PEN ND Multitec C65/2F-5.122/64. 14-15 V;
— Auxiliary and general plant equipment.