Performed works:
— Development of operational documentation of Azov WF.
— Performing the functions of accounting and document management during the commissioning and start-up of Azovskaya WF, supervising the commissioning works performed.
— Participation in the activities for obtaining the Certificate of fulfilment of technical specifications (TU) for process connection to the power grids of FSK EES PJSC.
— Participation in the preparation and implementation of measures to obtain a permit from the North Caucasus Department of the Federal Service for Ecological, Technological and Nuclear Supervision to allow the Azov WF to be put into operation.
— Process and operational management of Azovskaya WF during commissioning.
— Electrical installation and commissioning for 26 wind power units (WPU).
Equipment:
— Wind power unit type G132-3.465 MW manufactured by Siemens Gamesa Renewable Energy (SGRE): 26 pieces.
— Wind power units of G132-3.465 MW model are completed with 690 V dual-feed generators, U = 0.745/0.69 kV converters, 35/0.65 kV power transformers, WPU auxiliary equipment and 35 kV complete gas-insulated switchgear (GISG).